What Realistic 3V0-624 pdf Is?

Master the 3V0-624 VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam content and be ready for exam day success quickly with this Examcollection 3V0-624 free practice questions. We guarantee it!We make it a reality and give you real 3V0-624 questions in our VMware 3V0-624 braindumps.Latest 100% VALID VMware 3V0-624 Exam Questions Dumps at below page. You can use our VMware 3V0-624 braindumps and pass your exam.


2024 VMware Official New Released 3V0-624 ♥♥
https://www.certleader.com/3V0-624-dumps.html


P.S. Breathing 3V0-624 bible are available on Google Drive, GET MORE: https://drive.google.com/open?id=1AdP-kxdhQXyY8voAK3_SvgcNZ8Cx9Zod


New VMware 3V0-624 Exam Dumps Collection (Question 1 - Question 10)

Question No: 1

A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices.

u2022 All departments have different priorities and expectations for uptime of the required infrastructure and applications.

u2022 Project stakeholders are still discussing final approvals for the budget wan the CFO.

u2022 To drive down the operating cost of the environment, only blade servers will implement this project.

u2022 To ensure business continuity, a colocation provider was chosen to fail over virtual machines.

u2022 The implementation of the project will follow a public reference architecture provided by VMware. What is the assumption in this scenario?

A. The chosen architecture is sufficient.

B. All departments demand different SLAs.

C. Final budget approvals are being discussed.

D. The environment will be shared by several departments.

Answer: A


Question No: 2

A customer warns to virtualize an Oracle database with vSphere 6.5, but is concerned about its performance.

Which three design elements will ensure optimum performance? (Choose three.)

A. Share as much memory as possible with the balloon driver.

B. Use VMXNET3 for the network adapter.

C. Create affinity rules for the virtual machine to a single physical socket.

D. Use VMware Paravirtual SCSI adapters for data and log vDisk.

E. Enable Hyper-Threading

Answer: A B E


Question No: 3

After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?

A. A separate VMkernel interface may be configured per target.

B. A single VMkernel interface must be selected for all iSCSI targets.

C. The vSAN iSCSI Target service always uses all Management VMkernel interfaces.

D. The vSAN iSCSI Target service always uses the vMotion network.

Answer: A


Question No: 4

A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.

In this scenario, when two source types are supported? (Choose two.)

A. powered-off Windows Server 2008 physical machine

B. powered-on Windows Server 2000 Workstation virtual machine

C. powered-off Windows Server 2008 Workstation virtual machine

D. powered-on Windows Server 2008 physical machine

Answer: AB


Question No: 5

Categorize the tools as providing either Availability or Recoverability.

Answer:


Question No: 6

A company is outsourcing its support operations to an external service provider and plans to complete the project by April 1.

u2022 The external Support engineers must have the ability to power cycle, create, and edit virtual machines settings within their assigned vSphere site.

u2022 The company maintains three vCenter servers in Enhanced Linked Mode that are run as virtual machines in the supported infrastructure.

u2022 The vCenter servers will be supposed by the external service provider.

u2022 Each vCenter server is connected to its own local Platform Services Controller and MSSQL database server.

u2022 The company will provide escalation support and physical access on a per request basis.

u2022 99.9% ESXi host uptime is required in this environment, but no SLA has been specified for the hosted applications.

Drag each statement to its appropriate concept.

Answer:


Question No: 7

A company is designing a new vSphere cluster to support a mission-critical application.

u2022 The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.

u2022 The application consists of a group of 16 virtual machines, each with 8 vCPU configured. Which solution satisfies the availability requirements?

A. Guest OS-based software clustering

B. vSphere High Availability

C. vSphere High Availability Application Monitoring

D. vSphere Fault Tolerance

E. vSphere Site Recovery Manager

Answer: A


Question No: 8

Match the business statement to its appropriate concept.

Answer:


Question No: 9

A company would like to utilize its current infrastructure but wants to adopt virtualization to consolidate its environment. Currently, the infrastructure contains:

u2022 server with 2 x 8 cores CPUs and 96G8 of memory

u2022 backup LAN with a single physical switch

u2022 production LAN

u2022 sufficient datastore performance as determined by the storage team Match the existing infrastructure component to its appropriate concept.

Answer:


Question No: 10

A company has developers located in Eastern Europe (EE) and a QA Department in Bermuda.

u2022 The company is planning to create an environment based on a blueprint of 4-8 virtual machines for each of the developers and one for every QA project.

u2022 The proposed configuration will allow each developer to work independently and be able to collapse and re-create the environment as needed.

u2022 QA Teams will be able to recreate the environment that is required for a specific application.

u2022 Individual virtual machines in the blueprint are being continually updated with newly available software packages.

u2022 The company is planning to use the vSphere Content Library to store images and synchronize them between sites.

Which four supported configurations can the company implement? (Choose four.)

A. EE and Bermuda libraries that are backed by an NFS file system.

B. EE and Bermuda vCenter Servers with Enhanced Linked Mode.

C. FTP protocol to transfer data between published in EE and subscribed in Bermuda libraries.

D. Published library in EE backed by an NFS file system while subscribed library in Bermuda is backed up by datastore.

E. A minimum 10 GbE connection between EE published and Bermuda subscribed libraries is required.

F. EE and Bermuda vCenter Servers without Enhanced Linked Mode.

Answer: ABCE


P.S. Easily pass 3V0-624 Exam with Examcollection Breathing Dumps & pdf vce, Try Free: http://www.examcollectionuk.com/3V0-624-vce-download.html ( New Questions)